Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 41 EA type iii barricade 4'; 25 EA type iii barricade 8'; 242 SF temporary sign; 17,000 LF eradication of exist. Linear pvmt marking; 100 SF eradication of exist. Nonlinear pvmt mrkg; 93 EA temp. Pave. Marker 1 way; 26 EA temp. Pave. Marker 2 way; 22 EA temp. Pvmt. Symbol mrkg single turn arrow ty. A; 2 LS ns temporary traffic control signal; 2,790 ton aggr. Base matl. Ty. I no. 21b; 7,563 SY flexible pavement planing 0" - 2"; 3,420 sy flexble pave. Tie-in planing 0"- 2"; 169 sy flexible pave. Planing above 2"-4"; 20 LF handrail hr-1 type i; 2,647 LF std. Curb cg-2. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 15, 2026
Close: Feb 18, 2026
Streetscape Improvements.
AvailableRFP for streetscape improvements located on Long Beach Road between E. Atlantic Ave and Windsor Parkway in Oceanside, NY.
Posted Date
Jan 30, 2026
Due Date
Feb 27, 2026
Release: Jan 30, 2026
Close: Feb 27, 2026
RFP for streetscape improvements located on Long Beach Road between E. Atlantic Ave and Windsor Parkway in Oceanside, NY.
AvailableProcurement of labor and materials for Southbridge area streetscape improvements, including overhead and pedestrian lighting, crossings, sidewalks, bumpouts around Hicks Park, a new signal and crossings at C Street and New Castle Avenue, and bicycle striping designation on S. Claymont.
Posted Date
Jan 29, 2026
Due Date
Mar 3, 2026
Release: Jan 29, 2026
Close: Mar 3, 2026
Procurement of labor and materials for Southbridge area streetscape improvements, including overhead and pedestrian lighting, crossings, sidewalks, bumpouts around Hicks Park, a new signal and crossings at C Street and New Castle Avenue, and bicycle striping designation on S. Claymont.
AvailableConstruction includes: furnishing and installing all granite curb, sidewalks, brick pavers, asphalt, etc. Required for improving streetscape and parking lot
Posted Date
Dec 19, 2025
Due Date
Feb 10, 2026
Release: Dec 19, 2025
Close: Feb 10, 2026
Construction includes: furnishing and installing all granite curb, sidewalks, brick pavers, asphalt, etc. Required for improving streetscape and parking lot
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis