CityOH
Posted
-
Nov 3, 2026
East End Sanitary Sewer Rehabilitation - Phase 3 Improvements RFP
Work includes rehabilitation of approx. 5,225 LF of 8" through 10" sanitary sewer with a fold-and-form pipe lining system, minor to heavy cleaning and televising of 5,225 LF of sewer prior to lining to locate taps and remove roots, re-establishing 60 active laterals, televising 5,225 LF of lined sewer for verification, testing and grouting the laterals at the point of connection, lining 104 VF of concrete and brick/block sanitary manholes, lining 42.27 VF of steel manholes, restoration, and related items.