Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Winthrop seeks quotes from qualified contractors to repair and upgrade the Winthrop Street Sewer Pump Station. Work includes bypass pumping as needed, pump station cleanout, removal of existing grinder pumps and associated bases/rails, and installation of new pump bases/guide rails, check valves, two Barnes PS submersible grinder pumps, and new discharge piping. The contractor will perform startup and testing of the new system; procurement documents are available via the Town’s bid portal to plan holders.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The Town of Winthrop seeks quotes from qualified contractors to repair and upgrade the Winthrop Street Sewer Pump Station. Work includes bypass pumping as needed, pump station cleanout, removal of existing grinder pumps and associated bases/rails, and installation of new pump bases/guide rails, check valves, two Barnes PS submersible grinder pumps, and new discharge piping. The contractor will perform startup and testing of the new system; procurement documents are available via the Town’s bid portal to plan holders.
AvailableMiami-Dade Water and Sewer Department is soliciting contractors for storm hardening upgrades at Pump Station No.1, including flood-proofing building openings, hardening exterior equipment, ventilation improvements, and related civil, mechanical, electrical and instrumentation work. The project requires contractors with wastewater facility and sodium hypochlorite storage experience and appropriate general/building and specialty licenses; a mandatory pre-bid meeting/site visit is scheduled. Construction is expected to begin in April 2026 and last approximately 400 calendar days.
Posted Date
Jan 15, 2026
Due Date
Mar 5, 2026
Release: Jan 15, 2026
Close: Mar 5, 2026
Miami-Dade Water and Sewer Department is soliciting contractors for storm hardening upgrades at Pump Station No.1, including flood-proofing building openings, hardening exterior equipment, ventilation improvements, and related civil, mechanical, electrical and instrumentation work. The project requires contractors with wastewater facility and sodium hypochlorite storage experience and appropriate general/building and specialty licenses; a mandatory pre-bid meeting/site visit is scheduled. Construction is expected to begin in April 2026 and last approximately 400 calendar days.
Replacing aging electrical infrastructure at the city s pump station 2 (ps-2) to extend its service life.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
Replacing aging electrical infrastructure at the city s pump station 2 (ps-2) to extend its service life.
AvailableWork consists of Sewer and Drain Pump Station Wet Well Cleaning.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis