SW-2 Bypass Pumping & Rehabilitation RFP
Work consist of furnish & install 5' storm mh, furnish & install 30" hpp storm drainage pipe, furnish & install 48" hpp storm drainage pipe, remove and dispose of existing 12" drainage pipe, remove and dispose of existing 36" drainage pipe, core existing structure and install drainage pipe, f&i plug for existing 36" cmp drainage pipe, f&i plug for existing 48"x30" cmp drainage pipe, f&i plug for existing 48" rcp drainage pipe, connect existing drainage pipe to proposed drainage structure, mill and resurface type sp-9.5 asphalt overlay, furnish and place pavement restoration, furnish and place concrete sidewalk. See attached file.