Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Swamp mats to be used in muddy conditions where water may or may not be present. Lake to be dredged will be partially drained but water will still be present. Intent is for swamp mats to be installed on lake bed. Composite mats will be used to provide haevy equipment year-round access on varying ground surfaces. Will be used as ground protection and stabilization to safely move heavy equipment. May be used in conjuntion wit the swamp mats.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes the of dredging of the accumulated sediment from 23-acre mastodon lake using hydraulic dredging methods, dewatering and hauling of dredged materials, installation of mechanical mixing and aeration devices, installation of culvert pipes, as well as other miscellaneous appurtenances.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Project includes the of dredging of the accumulated sediment from 23-acre mastodon lake using hydraulic dredging methods, dewatering and hauling of dredged materials, installation of mechanical mixing and aeration devices, installation of culvert pipes, as well as other miscellaneous appurtenances.
AvailableBase work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Base work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
1 LS of Dredging Mobilization/Demobilization; Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material Reach 13 FIRST 14,000 CY; Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material Reach 13 OVER 14,000 CY (First Foot of Allowable Overdepth). See attached file.
Posted Date
Dec 5, 2025
Due Date
Jan 23, 2026
Release: Dec 5, 2025
Close: Jan 23, 2026
1 LS of Dredging Mobilization/Demobilization; Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material Reach 13 FIRST 14,000 CY; Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material Reach 13 OVER 14,000 CY (First Foot of Allowable Overdepth). See attached file.
Dredging the aerobic digester located at wastewater treatment plant.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Dredging the aerobic digester located at wastewater treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis