Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1 LS of Dredging Mobilization/Demobilization; Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material Reach 13 FIRST 14,000 CY; Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material Reach 13 OVER 14,000 CY (First Foot of Allowable Overdepth). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide harbor dredging services.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Provide harbor dredging services.
AvailableThe project consists of maintenance dredging of the federal navigation channels in Harbor to the authorized depths which range from 20 to 30 FT below MLLW and placement of the dredged material onto beaches located 1-2 miles south of the harbor. Dredged quantities vary, but average 250,000 cubic yards of material annually. The project includes a base bid for the first dredging cycle plus three options for additional dredging cycles.
Posted Date
Jan 8, 2026
Due Date
Feb 23, 2026
Release: Jan 8, 2026
Close: Feb 23, 2026
The project consists of maintenance dredging of the federal navigation channels in Harbor to the authorized depths which range from 20 to 30 FT below MLLW and placement of the dredged material onto beaches located 1-2 miles south of the harbor. Dredged quantities vary, but average 250,000 cubic yards of material annually. The project includes a base bid for the first dredging cycle plus three options for additional dredging cycles.
AvailableHarbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Posted Date
Oct 17, 2025
Due Date
Nov 5, 2028
Release: Oct 17, 2025
Close: Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
AvailableProvide harbor maintenance dredging. The Contractor will mobilize dredge to Alpena Harbor and dredge between the upstream and downstream limits as shown on the plans and place the dredge material.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Provide harbor maintenance dredging. The Contractor will mobilize dredge to Alpena Harbor and dredge between the upstream and downstream limits as shown on the plans and place the dredge material.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →