Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement.
Posted Date
Jan 20, 2026
Due Date
Feb 4, 2026
Release: Jan 20, 2026
Close: Feb 4, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement.
The project consists of maintenance dredging of the federal navigation channels in Harbor to the authorized depths which range from 20 to 30 FT below MLLW and placement of the dredged material onto beaches located 1-2 miles south of the harbor. Dredged quantities vary, but average 250,000 cubic yards of material annually. The project includes a base bid for the first dredging cycle plus three options for additional dredging cycles.
Posted Date
Jan 8, 2026
Due Date
Feb 23, 2026
Release: Jan 8, 2026
Close: Feb 23, 2026
The project consists of maintenance dredging of the federal navigation channels in Harbor to the authorized depths which range from 20 to 30 FT below MLLW and placement of the dredged material onto beaches located 1-2 miles south of the harbor. Dredged quantities vary, but average 250,000 cubic yards of material annually. The project includes a base bid for the first dredging cycle plus three options for additional dredging cycles.
AvailableProvide harbor maintenance dredging. The Contractor will mobilize dredge to Alpena Harbor and dredge between the upstream and downstream limits as shown on the plans and place the dredge material.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Provide harbor maintenance dredging. The Contractor will mobilize dredge to Alpena Harbor and dredge between the upstream and downstream limits as shown on the plans and place the dredge material.
AvailableBase work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Base work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →