New Lock Stoplogs (Request For Quotation) Detroit
Posted
Oct 20, 2026
Nov 4, 2026
Provide new lock stoplogs. The project involves the fabrication and delivery of two complete sets of stoplogs (16 total). The fabricator shall be certified under AISC 207-23 as an Advanced Bridge Fabricator, Intermediate Bridge Fabricator, or Advanced Hydraulic Fabricator. See attached file.


