CityUT
Posted
Aug 17, 2026
Sep 10, 2026
Draper Substation Rebuild
Provide construction services related to the removal of the existing substation, site preparation and construction of the draper electrical substation, including one 33MVA 46-12.47kV power transformer, switchgear, and associated equipment and labor required to complete a fully functional electrical substation.