CountyLA
Posted
Jul 7, 2026
Dec 1, 2026
PVC Pipe and Fittings - *Re-Bid*
Purchase of PVC pipe and fittings.
Description: The City of Austin is soliciting quotes for Schedule 40 PVC plumbing pipe fittings and tubing, including couplings, adapters, caps, and plugs. The contract requires delivery of standard and non-special items within seven calendar days of an order and mandates ASTM standards and the City’s right to return defective or non-conforming materials at no additional cost. The solicitation includes required delivery documentation and includes an Offer and Acceptance package, Scope of Work, and Quote Sheet as attachments.
City · TX, US
Adjacent opportunities open for bidding right now.
CountyLA
Posted
Jul 7, 2026
Dec 1, 2026
Purchase of PVC pipe and fittings.
CountyFL
Posted
Jul 1, 2026
Apr 6, 2031
The Palm Beach County Board of County Commissioners is seeking pre-qualified vendors for the purchase and delivery of PVC pipe and fittings under solicitation RPQ-680-26-022/JS-3. This Request for Qualification will establish a term contract where vendors must provide goods meeting county specifications and deliver them to designated locations on an as-needed basis. Vendors must maintain required insurance, comply with all local laws and regulations, and provide competitive pricing throughout the contract period.
CountyLA
Posted
Oct 27, 2026
Dec 1, 2026
Supply of pvc pipe and fittings.
CityTN
Posted
Nov 6, 2026
Dec 2, 2026
The City of Pigeon Forge Public Works Department is receiving bids on water/sewer pipe and fittings for Utility Department for a period of one (1) year, January 1, 2027 - December 31, 2027.
Decision makers connected to this RFP from City of Austin.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
665 days before RFP
The July 18, 2024 City Council authorized a $120 million campus-wide airport utility infrastructure project involving storm drainage, water quality, and deicing systems.
APPENDIX A Summary of July 18, 2024 Council Actions Item 41 Authorized negotiation and execution of a professional services contract for engineering services for AUS Building Commissioning Services with Arup US, Inc., in an amount not to exceed $24,000,000. This contract allows the commissioning agent to provide services for AEDP and non-AEDP projects that…
City Council Memorandum
Agenda packet · Aug 27, 2024
Capital improvement plan
287 days before RFP
The initial 2026 Bond Project Request List included proposed Watershed Protection funding for drainage and stormwater programs, including small-scale work through IDIQ contracts.
Citywide 62 1 Watershed Protection Strategic Plan Identified Drainage & Stormwater Infrastructure Projects Projects to reduce the most severe flood, erosion, and water pollution risks as identified in Watershed Protection's Strategic and Asset Management Plans. Projects include storm drain infrastructure improvements, low-water crossing upgrades, stream…
City of Austin
Capital improvement plan · Jul 31, 2025
Board meeting
245 days before RFP
Austin Watershed Protection proposed a 2028 Waller Creek Guadalupe Flood Risk Reduction project comprising detention basins and related drainage improvements.
Austin Watershed Protection is proposing the construction of two detention basins in association with the Waller Creek Guadalupe Flood Risk Reduction Project. The lower multi-use detention basin will be approximately 75,000 square feet. The upper detention basin will be approximately 17,000 square feet. Approximately 46,136 additional square feet are…
City of Austin Recommendation for Action
Board meeting · Sep 11, 2025
Capital improvement plan
10 days before RFP
The BEATF recommended $75.4 million for watershed infrastructure projects and $9 million for small-scale and asset-management work.
2026 BEATF Final Recommendation ($766M) Categories Projects/Programs Recommended Funding ($M) Greenhouse Gas Emissions (MT 𝐶𝐶𝐶𝐶2𝑒𝑒) Transportation Bridges 8 10,667 Bikeways 15 -861 Sidewalks 60 -3,375 Urban Trails 10 -372 Safe Routes to Schools 10 -1,143 Vision Zero 25 -1,582 Electric Vehicle Charging Infrastructure 13 -151,771 Transit Enhancements 6…
City of Austin 2026 BEATF Final Recommendation 2026
Capital improvement plan · May 4, 2026
RFP published
Proposals due (38 days left)