Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work comprises milling of the roadway, tack coat, installation of Superpave HMA 9.5mm scratch coat and Superpave HMA 9.5mm overlay, 2% crown on center, adjust manholes, if required, seal all joints, full depth restoration areas will be determined after milling, which will include excavation, 2A Subbase and Superpave HMA 25mm and all appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Street reconstruction.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
Street reconstruction.
Available2026 Village Street Reconstruction.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
2026 Village Street Reconstruction.
AvailableConcrete pavement reconstruction of 35th Street, including removal and replacement of pavement, installation of sidewalk and sidewalk ramps, storm sewer, traffic control, and sodding.
Posted Date
Jan 4, 2026
Due Date
Jan 20, 2026
Release: Jan 4, 2026
Close: Jan 20, 2026
Concrete pavement reconstruction of 35th Street, including removal and replacement of pavement, installation of sidewalk and sidewalk ramps, storm sewer, traffic control, and sodding.
AvailableProject includes the reconstruction street and includes a 26-LF wide 8" depth PCC urban roadway section. The project will include 6" modified subbase, longitudinal subdrain, storm sewer, sanitary sewer, and water main replacement, 6" PCC driveways, 5-foot-wide sidewalks, and ada curb ramps. Bid alternate 1: the project also includes additional storm sewer replacement along the street which will include driveway and sidewalk replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Project includes the reconstruction street and includes a 26-LF wide 8" depth PCC urban roadway section. The project will include 6" modified subbase, longitudinal subdrain, storm sewer, sanitary sewer, and water main replacement, 6" PCC driveways, 5-foot-wide sidewalks, and ada curb ramps. Bid alternate 1: the project also includes additional storm sewer replacement along the street which will include driveway and sidewalk replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis