Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,800, use sole source.
Coops: Lead with cooperative contracts (e.g., Sourcewell or PA COSTARS) to bypass formal bidding.
City of Shamokin, PA. There is no history of sole source awards above $23,800; assume formal bidding for needs over this threshold.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Shamokin's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Parks & Recreation Director
Controller
Deputy Administrator
Director of Accounts & Finance
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Shamokin
This RFP is for labor, materials, and services for roof replacement and associated building repairs at the historic post office building.
Posted Date
-
Due Date
Jan 23, 2026
City of Shamokin
Close: Jan 23, 2026
This RFP is for labor, materials, and services for roof replacement and associated building repairs at the historic post office building.
AvailableCity of Shamokin
Work comprises milling of the roadway, tack coat, installation of Superpave HMA 9.5mm scratch coat and Superpave HMA 9.5mm overlay, 2% crown on center, adjust manholes, if required, seal all joints, full depth restoration areas will be determined after milling, which will include excavation, 2A Subbase and Superpave HMA 25mm and all appurtenances.
Posted Date
Jul 26, 2025
Due Date
Aug 25, 2025
Release: Jul 26, 2025
City of Shamokin
Close: Aug 25, 2025
Work comprises milling of the roadway, tack coat, installation of Superpave HMA 9.5mm scratch coat and Superpave HMA 9.5mm overlay, 2% crown on center, adjust manholes, if required, seal all joints, full depth restoration areas will be determined after milling, which will include excavation, 2A Subbase and Superpave HMA 25mm and all appurtenances.
City of Shamokin
Work comprises the demolition of all structures, sheds, other ancillary property structures, rubbish, asbestos abatement as needed, property restoration and all appurtenances for a complete job. All structures have been declared unsafe to enter to complete the asbestos testing. The engineer's certified asbestos inspector will be onsite during the demolition process. The building materials must be kept adequately wet at all times, starting with the demolition process, through site cleanup, transport and final disposal. "adequately wet" means sufficiently wet to prevent the release of particulates and there are no visible emissions observed from any asbestos-containing material.
Posted Date
Feb 17, 2025
Due Date
Mar 5, 2025
Release: Feb 17, 2025
City of Shamokin
Close: Mar 5, 2025
Work comprises the demolition of all structures, sheds, other ancillary property structures, rubbish, asbestos abatement as needed, property restoration and all appurtenances for a complete job. All structures have been declared unsafe to enter to complete the asbestos testing. The engineer's certified asbestos inspector will be onsite during the demolition process. The building materials must be kept adequately wet at all times, starting with the demolition process, through site cleanup, transport and final disposal. "adequately wet" means sufficiently wet to prevent the release of particulates and there are no visible emissions observed from any asbestos-containing material.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.