Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be performed under this contract includes the construction of Dog Park #1: erosion and sediment control, demolition of existing features (fencing, concrete pavement, crusher fines, gates), remove and store some existing features (benches, picnic tables, decorative dog’s hydrants, toy boxes, dog tunnel, kiosk), installation of new fencing, extension of water line into park, concrete flatwork, crusher fines walks, dog water features, a rain garden, landscape boulders, signage, modification to existing irrigation system, grading, finish grading, landscape restoration/revegetation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Solicitations for Dog Park Turf and Rubber Improvements for The Village of Key Biscayne.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Solicitations for Dog Park Turf and Rubber Improvements for The Village of Key Biscayne.
AvailableProvide new turf installation, turf removal, base repair, turf reinstallation, and bonded rubber mulch installation within designated areas of the dog park. Work includes removal of existing synthetic turf where root intrusion has occurred, preparing the base for proper installation, reinstalling existing turf, and installing bonded rubber mulch around specific tree ring areas. Contractor shall provide all necessary labor, materials, and equipment for renovation.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Provide new turf installation, turf removal, base repair, turf reinstallation, and bonded rubber mulch installation within designated areas of the dog park. Work includes removal of existing synthetic turf where root intrusion has occurred, preparing the base for proper installation, reinstalling existing turf, and installing bonded rubber mulch around specific tree ring areas. Contractor shall provide all necessary labor, materials, and equipment for renovation.
The project generally consists of grading and installation of a city park facility parking lot with demolition, clearing/grubbing, grading, stone/asphalt installation, lighting, electrical, sidewalk, final stabilization and associated miscellaneous work.
Posted Date
Jan 7, 2026
Due Date
Feb 2, 2026
Release: Jan 7, 2026
Close: Feb 2, 2026
The project generally consists of grading and installation of a city park facility parking lot with demolition, clearing/grubbing, grading, stone/asphalt installation, lighting, electrical, sidewalk, final stabilization and associated miscellaneous work.
AvailableWork includes 1 EA sub-base installation (4" gravel); 1 EA concrete sidewalk (3,000 psi, broom finish); 1 EA formwork & joints.
Posted Date
Dec 5, 2025
Due Date
Jan 21, 2026
Release: Dec 5, 2025
Close: Jan 21, 2026
Work includes 1 EA sub-base installation (4" gravel); 1 EA concrete sidewalk (3,000 psi, broom finish); 1 EA formwork & joints.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →