Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Dog House Pump Station Replacement
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide construction services to rehab two (2) aging pump stations. Contractor shall provide hatches, piping, conduit, plug valves, pump outs, check valves, flange kits, and stainless-steel hardware. Contractor shall provide all other needed material including, but not limited to schedule 40 stainless steel pipe, pump rails, fittings, air relief valves, risers, ram-neck, hardware, road base, concrete, and asphalt. Contractor will be responsible for sub-contracting and scheduling coating of pump station wet well with City approved product. Contractor shall provide by passing/pumping with SCADA and or back up pumping while station is off and or down. New hatches with safety grates per City standards will be required for both stations.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 12, 2026
Provide construction services to rehab two (2) aging pump stations. Contractor shall provide hatches, piping, conduit, plug valves, pump outs, check valves, flange kits, and stainless-steel hardware. Contractor shall provide all other needed material including, but not limited to schedule 40 stainless steel pipe, pump rails, fittings, air relief valves, risers, ram-neck, hardware, road base, concrete, and asphalt. Contractor will be responsible for sub-contracting and scheduling coating of pump station wet well with City approved product. Contractor shall provide by passing/pumping with SCADA and or back up pumping while station is off and or down. New hatches with safety grates per City standards will be required for both stations.
AvailableThe scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
Close: Feb 20, 2026
The scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
AvailableRelease: Jan 27, 2026
Close: Feb 24, 2026
Standby generator at the pump station.
AvailableRelease: Jan 27, 2026
Close: Feb 24, 2026
Standby generator at the pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →