Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of digital fire alarm communication system upgrade. Includes evaluate and implement a modern, NFPA 72-compliant fire alarm communication system across district facilities. The goal is to replace analog and copper-based systems with dacts enabled solutions featuring dual-path transmission (cellular/ip); 24/7/365 central monitoring with automatic supervision; 60-second signal failure notification; system redundancy independent of analog phone lines; compatibility with current and future fire alarm panels.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Chequamegon School District seeks proposals to replace its entire fire alarm/mass notification system across a facility of approximately 190,000 square feet. This includes the removal and disposal of existing equipment and the installation of a new addressable medium-to-large voice-capable fire alarm system that meets Wisconsin code. The project must be completed by December 15, 2025, with an estimated contract value between $500,000 and $1,500,000. The solicitation was posted 2025-12-17, and the response deadline is 2026-02-11.
Posted Date
Dec 17, 2025
Due Date
Feb 11, 2026
Release: Dec 17, 2025
Close: Feb 11, 2026
Chequamegon School District seeks proposals to replace its entire fire alarm/mass notification system across a facility of approximately 190,000 square feet. This includes the removal and disposal of existing equipment and the installation of a new addressable medium-to-large voice-capable fire alarm system that meets Wisconsin code. The project must be completed by December 15, 2025, with an estimated contract value between $500,000 and $1,500,000. The solicitation was posted 2025-12-17, and the response deadline is 2026-02-11.
AvailableFire alarm system replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Fire alarm system replacement.
AvailableFire alarm system installation services.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Close: Jan 19, 2026
Fire alarm system installation services.
AvailableThe existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
Posted Date
Aug 13, 2025
Due Date
Feb 4, 2026
Release: Aug 13, 2025
Close: Feb 4, 2026
The existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.