Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Dallas-Fort Worth International Airport Board (Airport Board) is soliciting quotes via an electronic RFQ for a Utility Tunnel Sump Pump System with specific technical specifications. Submissions must be made through the Airport’s Bonfire portal and will not be accepted by mail or email; delivery is F.O.B. DFW International Airport (Central Warehouse at 3122 East 30th Street). The opportunity is open and scheduled to close on 2026-01-07 at 14:00 CST (2:00 PM), with questions due prior to that date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
Approx 4550 LF 4" sump pump collector; 4550 LF 4" boring; 4550 LF tracer wire; etc. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 8, 2026
Release: Dec 19, 2025
Close: Jan 8, 2026
Approx 4550 LF 4" sump pump collector; 4550 LF 4" boring; 4550 LF tracer wire; etc. See attached file.
Work includes tunnel ventilation system and insulation.
Posted Date
Dec 20, 2025
Due Date
Jan 15, 2026
Release: Dec 20, 2025
Close: Jan 15, 2026
Work includes tunnel ventilation system and insulation.
AvailableWork will consist of repair and refurbishment of existing electrical lighting and fire suppression systems within the Lewis Reef Road tunnel corridor. This tunnel extends underneath the existing Ketchikan Airport runway and accesses the Gravina Island road system. Existing systems have significantly deteriorated and are not properly functioning.
Posted Date
Dec 29, 2025
Due Date
Jan 12, 2026
Release: Dec 29, 2025
Close: Jan 12, 2026
Work will consist of repair and refurbishment of existing electrical lighting and fire suppression systems within the Lewis Reef Road tunnel corridor. This tunnel extends underneath the existing Ketchikan Airport runway and accesses the Gravina Island road system. Existing systems have significantly deteriorated and are not properly functioning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →