Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Inglewood solicits a contractor to remove, replace, and install complete sewage sump pump systems at three locations (City Hall Sub-Basement, EOC Sub-Basement, and the Police Station), including pumps, discharge piping, full-port gates, check valves, controls (SJE Rhombus or equivalent), start and high-water float switches, and submersible pumps. The Police Station also requires a new 208/230V 20A circuit. A mandatory pre-bid conference is scheduled for 2025-12-16 at 9:00 AM PST and the response deadline is 2026-01-14; official posting and documents are hosted on the City’s PlanetBids portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Supply duplex sump pump. Two (2) new Sump Pumps, two (2) 5 HP Motors, and one (1) Duplex Control Panel. Furnish two (2), automatic motor driven sump pumps for 25 GPM against a static head of 123 feet and accommodate a pit depth of 26.5'. Components of the pump shall include the discharge head assembly, column and shaft assembly, and bowl assembly. The discharge head assembly shall be equipped with a (3) inch 125# ANSI Flange to adapt to the existing discharge piping. Column assembly shall be sized accordingly to the pit depth. Motors Each motor shall be hollow shaft, connected by a threaded coupling. The motor shall be vertically mounted, wired for three phase, 5 HP, 30 Amp, 240 VAC. Speed of the motor must be 3600rpm. Motor load shall not exceed service factor. 8 AWG wire shall be used
Posted Date
Nov 28, 2025
Due Date
Dec 16, 2025
Release: Nov 28, 2025
Premium
Access the largest public sector contact database
Supply duplex sump pump. Two (2) new Sump Pumps, two (2) 5 HP Motors, and one (1) Duplex Control Panel. Furnish two (2), automatic motor driven sump pumps for 25 GPM against a static head of 123 feet and accommodate a pit depth of 26.5'. Components of the pump shall include the discharge head assembly, column and shaft assembly, and bowl assembly. The discharge head assembly shall be equipped with a (3) inch 125# ANSI Flange to adapt to the existing discharge piping. Column assembly shall be sized accordingly to the pit depth. Motors Each motor shall be hollow shaft, connected by a threaded coupling. The motor shall be vertically mounted, wired for three phase, 5 HP, 30 Amp, 240 VAC. Speed of the motor must be 3600rpm. Motor load shall not exceed service factor. 8 AWG wire shall be used
AvailableProvide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 12, 2025
Release: Jul 16, 2025
Close: Dec 12, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Work includes upgrade of key electrical infrastructure and distribution systems and bathroom upgrades.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Close: Jan 16, 2026
Work includes upgrade of key electrical infrastructure and distribution systems and bathroom upgrades.
AvailableEngineering design support to upgrade the Laurel Drive pump station: evaluation (including flow and environmental assessments), three site visits, limited survey, coordination with vendors, final design, construction drawings/specifications, opinion of probable construction cost, and permit identification/preparation of construction documents. Contract duration: 180 calendar days. Solicitation for qualified Delaware-licensed engineering firms.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Engineering design support to upgrade the Laurel Drive pump station: evaluation (including flow and environmental assessments), three site visits, limited survey, coordination with vendors, final design, construction drawings/specifications, opinion of probable construction cost, and permit identification/preparation of construction documents. Contract duration: 180 calendar days. Solicitation for qualified Delaware-licensed engineering firms.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis