Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Engineering design support to upgrade the Laurel Drive pump station: evaluation (including flow and environmental assessments), three site visits, limited survey, coordination with vendors, final design, construction drawings/specifications, opinion of probable construction cost, and permit identification/preparation of construction documents. Contract duration: 180 calendar days. Solicitation for qualified Delaware-licensed engineering firms.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Provide engineering services for design and construction administration of a system wide pump station telemetry upgrade project.
Posted Date
Nov 25, 2025
Due Date
Jan 14, 2026
Release: Nov 25, 2025
Close: Jan 14, 2026
Provide engineering services for design and construction administration of a system wide pump station telemetry upgrade project.
AvailableKennebunk Sewer District seeks engineering design services for upgrading the Boothby Road Pump Station in Kennebunk, Maine. The project involves evaluating and upgrading the existing pump station to improve resilience against flooding, reusing existing pumps, and incorporating a new wet well with increased capacity. The selected firm will provide bid-ready construction documents and prepare necessary permit applications.
Posted Date
Oct 31, 2025
Due Date
Dec 30, 2025
Release: Oct 31, 2025
Close: Dec 30, 2025
Kennebunk Sewer District seeks engineering design services for upgrading the Boothby Road Pump Station in Kennebunk, Maine. The project involves evaluating and upgrading the existing pump station to improve resilience against flooding, reusing existing pumps, and incorporating a new wet well with increased capacity. The selected firm will provide bid-ready construction documents and prepare necessary permit applications.
AvailableProvide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 12, 2025
Release: Jul 16, 2025
Close: Dec 12, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
This project consists of the installation of 1,269+/- feet of 8" diameter PVC, DIP, and Steel sewer line to eliminate the existing pump station located within the Laurel Park subdivision. Five (5) new manholes will be installed and Two (2) existing manholes will be renovated as part of this project.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
This project consists of the installation of 1,269+/- feet of 8" diameter PVC, DIP, and Steel sewer line to eliminate the existing pump station located within the Laurel Park subdivision. Five (5) new manholes will be installed and Two (2) existing manholes will be renovated as part of this project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis