Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Concord
This project consists of the installation of 1,269+/- feet of 8" diameter PVC, DIP, and Steel sewer line to eliminate the existing pump station located within the Laurel Park subdivision. Five (5) new manholes will be installed and Two (2) existing manholes will be renovated as part of this project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Norfolk
The City of Norfolk is requesting Statements of Qualifications from design‑build teams to provide turnkey design and construction services for the Harbor Park Pump Station. This Phase One RFQ precedes a Phase Two RFP and covers a new stormwater pump station and associated site improvements in Norfolk, VA.
Posted Date
Nov 3, 2025
Due Date
Dec 12, 2025
Release: Nov 3, 2025
City of Norfolk
Close: Dec 12, 2025
The City of Norfolk is requesting Statements of Qualifications from design‑build teams to provide turnkey design and construction services for the Harbor Park Pump Station. This Phase One RFQ precedes a Phase Two RFP and covers a new stormwater pump station and associated site improvements in Norfolk, VA.
AvailableVirginia Department of Conservation and Recreation
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Virginia Department of Conservation and Recreation
Close: Dec 17, 2025
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
AvailableCity of Newport News
Pump station pump replacement
Posted Date
Oct 29, 2025
Due Date
Nov 25, 2025
Release: Oct 29, 2025
City of Newport News
Close: Nov 25, 2025
Pump station pump replacement
AvailableCity of Durango
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
Posted Date
Jul 2, 2025
Due Date
Dec 9, 2025
Release: Jul 2, 2025
City of Durango
Close: Dec 9, 2025
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis