Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes tunnel ventilation system and insulation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project provides for: Traffic Control, Replacing existing Runway 17-35 tunnel lighting with LED type lighting fixtures. Replacing the existing conduit and wiring. Upgrading the lighting controls.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
This project provides for: Traffic Control, Replacing existing Runway 17-35 tunnel lighting with LED type lighting fixtures. Replacing the existing conduit and wiring. Upgrading the lighting controls.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Ventilation system verification testing and balancing services.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
Ventilation system verification testing and balancing services.
AvailableThe U.S. Coast Guard Surface Force Logistics Center is soliciting firm-fixed price quotations for cleaning and inspecting the Gaylord Hood ventilation system and FM-200 fire extinguishing hoses on the CGC Joseph Gerczak. Quotations are due January 8, 2026, at 6:00 PM. The period of performance is scheduled from January 26, 2026, through March 9, 2026, in Honolulu, HI.
Posted Date
Dec 30, 2025
Due Date
Jan 8, 2026
Release: Dec 30, 2025
Close: Jan 8, 2026
The U.S. Coast Guard Surface Force Logistics Center is soliciting firm-fixed price quotations for cleaning and inspecting the Gaylord Hood ventilation system and FM-200 fire extinguishing hoses on the CGC Joseph Gerczak. Quotations are due January 8, 2026, at 6:00 PM. The period of performance is scheduled from January 26, 2026, through March 9, 2026, in Honolulu, HI.
AvailableDESIGN-BUILD: Work includes progressive design-build civil and tunnel construction.
Posted Date
Dec 19, 2025
Due Date
Jun 4, 2026
Release: Dec 19, 2025
Close: Jun 4, 2026
DESIGN-BUILD: Work includes progressive design-build civil and tunnel construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →