U.S. Army Engineer District Portland
FederalOR
Posted
Aug 20, 2026
Sep 3, 2026
John Day STS Roller Chain for Fish Screens (Request For Quotation) Rufus
Provide roller chains to be used on the Submerged Traveling Screen (STS) system.
Description: The U.S. Army Corps of Engineers (USACE) Portland District is seeking industry input for a design-build self-cleaning screen system rated for juvenile fish at the Dexter Dam Adult Fish Facility intake in Fall Creek, Oregon, to meet National Marine Fisheries Service requirements. The anticipated work includes engineering redesign and analysis, fabrication and procurement of system components, underwater rock removal, and installation or attachment to the existing intake structure. This active Sources Sought notice is for market research toward a future procurement, with responses due September 9, 2026, at 3:00 PM PDT.
Federal · OR, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
U.S. Army Engineer District Portland
FederalOR
Posted
Aug 20, 2026
Sep 3, 2026
Provide roller chains to be used on the Submerged Traveling Screen (STS) system.
FederalVA
Posted
Sep 2, 2026
Sep 7, 2026
NSN 4320 01-682-4531 Housing Intake PART_NBR: X59612300095 QTY: 12 Ea.
CityAR
Posted
Aug 10, 2026
Sep 14, 2026
Project includes the following Work: Extend the City of Ola’s raw water intake further into the lake to draw from greater depths, thereby significantly improving raw water quality. The work includes installing submerged 12-inch HDPE DR17 piping from the existing intake tower to a deeper lake-bed terminus. This new underwater intake terminus features dual passive cylindrical wedge-wire T-screens anchored to a heavy 6'x6' reinforced concrete foundation. To secure the underwater work zone and alert public marine traffic, five (5) high-visibility regulatory warning buoys will be permanently anchored on the lake surface at a 300-foot radius around the submerged pipeline.
North Jersey District Water Supply Commission (NJDWSC)
Special DistrictNJ
Posted
Jul 20, 2026
Oct 6, 2026
Successful Bidder will be responsible for procuring the necessary materials for, and installation of non-permanent aluminum plates to block the Commission's Lower Intake. he Successful Bidder shall also be responsible for assisting Commission Maintenance Personnel in removing the existing stop logs in the Lower Intake Channel, located in the Upper Gate House. The Elevator Contractor will be responsible to obtain permits and certification for operation, inspection, and testing.
Decision makers connected to this RFP from U.S. Army Engineer District Portland.