City of Galena
Repair three (3) piles per details on provided drawings; remove existing concrete encasement to extent required for reinforcing installation, maximum 3'-0" below damage to pile , Traffic control: the bridge shall remain open during construction All waste material from removals shall become the property of the contractor, removed from the site and be disposed of properly.
RFQ__2025_Dewey_Bridge_Emergency_Re_A9DB7D4CD1A6A
Release
Jan 07, 2025
Close
Jan 23, 2025