Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Boulder City, Nevada seeks proposals for the development of utility-scale solar power generation and/or battery energy storage system facilities. The project involves leasing city property for the construction and operation of these facilities, with a focus on renewable energy development. Proposers must plan, finance, develop, construct, and operate the facilities, adhering to specific lease rates and fire safety assessment fees. The RFP emphasizes compliance with Nevada laws and Boulder City ordinances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
Posted Date
Oct 16, 2025
Due Date
Jan 20, 2026
Release: Oct 16, 2025
Close: Jan 20, 2026
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
AvailableBattery energy storage system.
Posted Date
Dec 10, 2025
Due Date
Feb 5, 2026
Release: Dec 10, 2025
Close: Feb 5, 2026
Battery energy storage system.
AvailableProject will create a 2.1 MW DC (1.4 MW AC) maximum solar canopy adjacent to the WWTP to offset a portion of current energy usage at a WWTP. The design must include a minimum of 13ft elevation of the panels due to floodplain concerns and the Respondent’s submittal should include, but is not limited to: major milestones schedule, including provisions for: permitting & licensing, as applicable; engineering, procurement, and construction; testing strategy. Proposed strategy for adding additional solar generation and extensibility. List of major equipment supplies proposed to be utilized for project development. Supply chain risk mitigation strategy.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Project will create a 2.1 MW DC (1.4 MW AC) maximum solar canopy adjacent to the WWTP to offset a portion of current energy usage at a WWTP. The design must include a minimum of 13ft elevation of the panels due to floodplain concerns and the Respondent’s submittal should include, but is not limited to: major milestones schedule, including provisions for: permitting & licensing, as applicable; engineering, procurement, and construction; testing strategy. Proposed strategy for adding additional solar generation and extensibility. List of major equipment supplies proposed to be utilized for project development. Supply chain risk mitigation strategy.
The City of Santa Barbara is soliciting proposals to design, build, own, operate, and maintain a solar photovoltaic (PV) system and battery energy storage system (BESS) at the Plaza Vera Cruz Community Building (130 E. Cota St.). The selected provider will enter a 25-year Power Purchase Agreement (PPA) to supply as much of the facility’s energy load as possible with on-site renewable power at the lowest possible cost to the City. The solicitation is an RFP (not a grant), includes a non-mandatory pre-bid conference on 2026-01-06, and is managed through the City’s PlanetBids portal.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
The City of Santa Barbara is soliciting proposals to design, build, own, operate, and maintain a solar photovoltaic (PV) system and battery energy storage system (BESS) at the Plaza Vera Cruz Community Building (130 E. Cota St.). The selected provider will enter a 25-year Power Purchase Agreement (PPA) to supply as much of the facility’s energy load as possible with on-site renewable power at the lowest possible cost to the City. The solicitation is an RFP (not a grant), includes a non-mandatory pre-bid conference on 2026-01-06, and is managed through the City’s PlanetBids portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis