Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for civil engineering services for the design of an avenue, scope of services includes preliminary study and report phase, design (schematic) phase, final design phase, preparation of contract documents and bidding phase, and construction services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
Close: Dec 18, 2025
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Premium
Access the largest public sector contact database
Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
Posted Date
Nov 17, 2025
Due Date
Dec 23, 2025
Release: Nov 17, 2025
Close: Dec 23, 2025
Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
AvailableWork consist of 782 LF of desilting pipe culverts and storm sewers, 15,700 SY of performance turf (sod), remove the emergent vegetation that has grown in the pond bottom and side slopes.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consist of 782 LF of desilting pipe culverts and storm sewers, 15,700 SY of performance turf (sod), remove the emergent vegetation that has grown in the pond bottom and side slopes.
AvailableThe City of Yuma is soliciting qualifications for professional design services for construction of a new segment of 40th Street from Avenue 6E to Avenue 7E, including roadway, multi-use path, drainage, traffic signals, lighting and associated infrastructure. The solicitation is an RFQ/RFP for civil engineering and related design services and includes multiple supporting documents (preliminary design concept report, traffic analysis, environmental considerations and draft 15% plans) attached on the Bonfire posting. The opportunity is active and managed on the City of Yuma's Bonfire portal; files are listed on the Bonfire page but require a Bonfire account to download.
Posted Date
Nov 26, 2025
Due Date
Jan 29, 2026
Release: Nov 26, 2025
Close: Jan 29, 2026
The City of Yuma is soliciting qualifications for professional design services for construction of a new segment of 40th Street from Avenue 6E to Avenue 7E, including roadway, multi-use path, drainage, traffic signals, lighting and associated infrastructure. The solicitation is an RFQ/RFP for civil engineering and related design services and includes multiple supporting documents (preliminary design concept report, traffic analysis, environmental considerations and draft 15% plans) attached on the Bonfire posting. The opportunity is active and managed on the City of Yuma's Bonfire portal; files are listed on the Bonfire page but require a Bonfire account to download.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis