Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
Close: Dec 18, 2025
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Premium
Access the largest public sector contact database
Work includes 1 LS clearing and grubbing; 5,951 CY excavation; 8,144 SY curing coat; 11,076 SF 4" concrete walk; 45 SF curb ramp; 267 SY repair seeding and mulching; 12 MSF mowing; 230 SY ditch erosion protection mat, type b; 200,000 EA erosion control; 87 SY pavement planing, asphalt concrete; 689 GAL non-tracking tack coat; 35 CY asphalt concrete surface course; 275 LF combination curb and gutter, type 9; 235 LF 12" conduit, type b; 2 EA manhole; 536 LF 12" water main ductile iron pipe ansi class 52, push-on joints and fittings; 975 LF trench, 24" deep; 112 SY riprap, misc. ; 148. 45 SF sign, flat sheet; 0.32 mile center line; 72 LF yield line.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Work includes 1 LS clearing and grubbing; 5,951 CY excavation; 8,144 SY curing coat; 11,076 SF 4" concrete walk; 45 SF curb ramp; 267 SY repair seeding and mulching; 12 MSF mowing; 230 SY ditch erosion protection mat, type b; 200,000 EA erosion control; 87 SY pavement planing, asphalt concrete; 689 GAL non-tracking tack coat; 35 CY asphalt concrete surface course; 275 LF combination curb and gutter, type 9; 235 LF 12" conduit, type b; 2 EA manhole; 536 LF 12" water main ductile iron pipe ansi class 52, push-on joints and fittings; 975 LF trench, 24" deep; 112 SY riprap, misc. ; 148. 45 SF sign, flat sheet; 0.32 mile center line; 72 LF yield line.
AvailableWork includes approx 24 EA potholing; 1 LS clearing and grubbing; 4,875 CY roadway excavation including haul; 441 LF 18" DI storm sewer; 1,773 LF 12" DIP water main; 273 LF 8" sewer pipe; 8 EA side sewer cleaning and video inspection. See outside link.
Posted Date
-
Due Date
Dec 15, 2025
Close: Dec 15, 2025
Work includes approx 24 EA potholing; 1 LS clearing and grubbing; 4,875 CY roadway excavation including haul; 441 LF 18" DI storm sewer; 1,773 LF 12" DIP water main; 273 LF 8" sewer pipe; 8 EA side sewer cleaning and video inspection. See outside link.
AvailableThe City of Kent invites sealed bids for the Meeker Street – Washington Avenue to Interurban Trail corridor improvement project. The work includes new concrete sidewalks, landscaping and irrigation, asphalt overlay, a raised intersection and roundabout, channelization, lighting, RRFBs, and stormwater, watermain, and sanitary sewer replacements, with an estimated construction range of approximately $8–9 million and a 14% FSBE goal. Bids are due January 6, 2026 at 11:00 a.m. Pacific Time; plans and specifications are available through the City’s procurement page and only sealed paper bids will be accepted.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
The City of Kent invites sealed bids for the Meeker Street – Washington Avenue to Interurban Trail corridor improvement project. The work includes new concrete sidewalks, landscaping and irrigation, asphalt overlay, a raised intersection and roundabout, channelization, lighting, RRFBs, and stormwater, watermain, and sanitary sewer replacements, with an estimated construction range of approximately $8–9 million and a 14% FSBE goal. Bids are due January 6, 2026 at 11:00 a.m. Pacific Time; plans and specifications are available through the City’s procurement page and only sealed paper bids will be accepted.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis