Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk – Sikaflex-1C SL, high performance, self-leveling, 1-part polyurethane or approved equal. Curbing – Sikaflex-2C NS, two component, non-sag, polyurethane elastomeric or approved equal. Excavate to required depth and width, remove and dispose of material, including any existing sidewalks, and compact the subgrade material to a firm, even surface to the designed grade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cresson Borough (Cambria County, PA) is soliciting sealed bids for the Keystone Avenue Sidewalk Project to remove existing sidewalk/pavement and install 490 SY of 4" concrete sidewalk, 930 LF of concrete curb, 4 ADA-compliant curb ramps with detectable warnings, trench drain, driveway tie-ins, roadway restoration, and related work. Bids are due electronically via PennBid on February 27, 2026 at 12:00 PM EST, and the successful bidder must complete all work prior to May 21, 2026. The project is partially funded by a Multimodal Transportation Fund Grant from the Commonwealth of Pennsylvania and local funds; solicitation documents and a pre-bid meeting (Feb 10, 2026, 10:00 AM local) are provided on the official PennBid posting.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cresson Borough (Cambria County, PA) is soliciting sealed bids for the Keystone Avenue Sidewalk Project to remove existing sidewalk/pavement and install 490 SY of 4" concrete sidewalk, 930 LF of concrete curb, 4 ADA-compliant curb ramps with detectable warnings, trench drain, driveway tie-ins, roadway restoration, and related work. Bids are due electronically via PennBid on February 27, 2026 at 12:00 PM EST, and the successful bidder must complete all work prior to May 21, 2026. The project is partially funded by a Multimodal Transportation Fund Grant from the Commonwealth of Pennsylvania and local funds; solicitation documents and a pre-bid meeting (Feb 10, 2026, 10:00 AM local) are provided on the official PennBid posting.
AvailableDemolition of existing sidewalk and pavement and the installation of 490 SY of 4" depth concrete sidewalk, 930 LF of concrete curb, 4 ADA curb ramps with detectable warning surface, sidewalk and driveway tie-ins, roadway restoration, 6" sidewalk trench drain, removal and resetting of post mounted signs, appurtenances, & all related work.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Demolition of existing sidewalk and pavement and the installation of 490 SY of 4" depth concrete sidewalk, 930 LF of concrete curb, 4 ADA curb ramps with detectable warning surface, sidewalk and driveway tie-ins, roadway restoration, 6" sidewalk trench drain, removal and resetting of post mounted signs, appurtenances, & all related work.
AvailableThe purpose of this project is to conduct asphalt resurfacing (2165 tons of new asphalt paving) of North 3rd Street from 8th Avenue North to 17th Avenue North, as well as full depth patching, along with curb & gutter replacement at the intersections along North 3rd Street. The project also includes ADA curb ramp improvements throughout North 3rd Street to maintain ADA compliance.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
The purpose of this project is to conduct asphalt resurfacing (2165 tons of new asphalt paving) of North 3rd Street from 8th Avenue North to 17th Avenue North, as well as full depth patching, along with curb & gutter replacement at the intersections along North 3rd Street. The project also includes ADA curb ramp improvements throughout North 3rd Street to maintain ADA compliance.
AvailableDesign Services for the Greenwood Avenue Sidewalk Project requests civil engineering/design services for a sidewalk improvement on Greenwood Avenue in Tennessee. The solicitation seeks firms experienced in NAICS 541310 to provide design services and references bid documents available from the issuing organization. The solicitation opened on 2026-01-13 and closes on 2026-02-06 at 2:30 PM CST; documents and contact details are accessible to registered users on the issuing organization's posting.
Posted Date
Jan 13, 2026
Due Date
Feb 6, 2026
Release: Jan 13, 2026
Close: Feb 6, 2026
Design Services for the Greenwood Avenue Sidewalk Project requests civil engineering/design services for a sidewalk improvement on Greenwood Avenue in Tennessee. The solicitation seeks firms experienced in NAICS 541310 to provide design services and references bid documents available from the issuing organization. The solicitation opened on 2026-01-13 and closes on 2026-02-06 at 2:30 PM CST; documents and contact details are accessible to registered users on the issuing organization's posting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →