Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Clay County
Clay County seeks proposals for bridge replacement on C.S.A.H. 14 between T.H. 336 and Co. Rd. 68, involving structural concrete, epoxy-coated reinforcement bars, and bridge slab concrete. Bidders must comply with predetermined wage rates and affirmative action requirements, with a DBE goal of 8.4%.
Posted Date
-
Due Date
Nov 5, 2024
Release: -
Clay County
Close: Nov 5, 2024
Clay County seeks proposals for bridge replacement on C.S.A.H. 14 between T.H. 336 and Co. Rd. 68, involving structural concrete, epoxy-coated reinforcement bars, and bridge slab concrete. Bidders must comply with predetermined wage rates and affirmative action requirements, with a DBE goal of 8.4%.
Clay County
Roundabout project. Work consists of 4,516 SY of concrete pavement 7.5"; 1,658 TON of type sp 12.5 non wearing course mixture (3,c); 3,026 TON of type sp 12.5 wearing course mixture (3,c); 592 LF of milled rumble strips; 311 LF of 15" rc pipe sewer design 3,006 class v; 492 LF of 18" rc pipe sewer design 3,006 class iii; 198 LF of 15" rc pipe sewer design 3,006 class v; 258 LF of 7" concrete walk; 559 SF of sign; 4,966 LF of silt fence, type ms; 810 LF of sediment control log type compost; 17,579 SY of rolled erosion prevention category 25. See outside link.
Posted Date
Feb 4, 2026
Due Date
Mar 10, 2026
Release: Feb 4, 2026
Clay County
Close: Mar 10, 2026
Roundabout project. Work consists of 4,516 SY of concrete pavement 7.5"; 1,658 TON of type sp 12.5 non wearing course mixture (3,c); 3,026 TON of type sp 12.5 wearing course mixture (3,c); 592 LF of milled rumble strips; 311 LF of 15" rc pipe sewer design 3,006 class v; 492 LF of 18" rc pipe sewer design 3,006 class iii; 198 LF of 15" rc pipe sewer design 3,006 class v; 258 LF of 7" concrete walk; 559 SF of sign; 4,966 LF of silt fence, type ms; 810 LF of sediment control log type compost; 17,579 SY of rolled erosion prevention category 25. See outside link.
Clay County
Major quantities of work include Mill Bituminous Surface (2.0"), SY. 31,129; Type SP 12.5 Wearing Course Mix (3,B), Ton. 8,101; 6" Solid Line Multi Comp, LF. 19,550.
Posted Date
Feb 21, 2026
Due Date
Feb 24, 2026
Release: Feb 21, 2026
Clay County
Close: Feb 24, 2026
Major quantities of work include Mill Bituminous Surface (2.0"), SY. 31,129; Type SP 12.5 Wearing Course Mix (3,B), Ton. 8,101; 6" Solid Line Multi Comp, LF. 19,550.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $5,000, use sole source.
Coops: Lead with Sourcewell or Minnesota CPV to purchase and bypass bidding.
Clay County, MN: No practical path. Minnesota’s sole source ceiling is about $5,000, and there’s no evidence of sole source awards.
Board meetings and strategic plans from Clay County
The Clay County Vision for 2045 emphasizes preserving the county's rural and agricultural character while promoting balanced growth and development. It focuses on equity, inclusion, and providing quality services to all residents. The vision recognizes the importance of agricultural and natural resources, seeks new economic opportunities, and promotes sound planning for economic, environmental, and community resilience to ensure Clay County thrives.
The Clay County Comprehensive Plan focuses on community resilience, housing, land use (agricultural, residential, commercial, and industrial), transportation systems, bicycle and pedestrian connectivity, freight, transit, streetscaping and safety, agriculture, natural resources and the environment (aggregate resources, environmental health, floodplains, prairies and woodlands, resource recovery and solid waste, shoreland and stormwater, wetlands), public open space, economic development, and intergovernmental coordination. It aims to express the county's aspirations for the future and implement its vision and principles, addressing social, economic, and environmental conditions through periodic reevaluation of goals and objectives.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Clay County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database