Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Orange City
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Indiana Department of Transportation
Work includes : 16,550 SY excavation, common; 12,135 SY geotextile for pavement, type 2a; 112 SY milling, asphalt, 1 1/2"; 320 LF curb, integral concrete; 4,060 LF pipe, type 4, circular, diameter 6"; see attached file.
Posted Date
Aug 13, 2025
Due Date
Dec 10, 2025
Release: Aug 13, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Work includes : 16,550 SY excavation, common; 12,135 SY geotextile for pavement, type 2a; 112 SY milling, asphalt, 1 1/2"; 320 LF curb, integral concrete; 4,060 LF pipe, type 4, circular, diameter 6"; see attached file.
AvailableMichigan Department of Technology, Management and Budget
0.49 mi of a roundabout construction including hot mix base crushing, shaping and resurfacing, concrete curb and gutter and pavement markings includes 3,867 CY excavation earth, 20 CY subgrade undercutting type II, 895 ton aggregate base, 5,017 SY HMA base crushing and shaping, 120 ton decorative stone river rock, 43 Sta trenching, 1 EA culv end sect. conc. 12", 1 EA sewer tap 18", 859 LF sewer CPP 12" Tr Det B, 750 LF conduit schedule 80 3", 368 LF water main C-900 PVC 12" Tr Det F.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
Michigan Department of Technology, Management and Budget
Close: Dec 5, 2025
0.49 mi of a roundabout construction including hot mix base crushing, shaping and resurfacing, concrete curb and gutter and pavement markings includes 3,867 CY excavation earth, 20 CY subgrade undercutting type II, 895 ton aggregate base, 5,017 SY HMA base crushing and shaping, 120 ton decorative stone river rock, 43 Sta trenching, 1 EA culv end sect. conc. 12", 1 EA sewer tap 18", 859 LF sewer CPP 12" Tr Det B, 750 LF conduit schedule 80 3", 368 LF water main C-900 PVC 12" Tr Det F.
AvailableCity of Hattiesburg
Work consists of lighting
Posted Date
Sep 21, 2025
Due Date
Dec 11, 2025
Release: Sep 21, 2025
City of Hattiesburg
Close: Dec 11, 2025
Work consists of lighting
AvailableOneida County
Oneida County is soliciting bids to construct a 2‑lane roundabout at the intersection of NYS Route 825 and Perimeter Road in Rome, NY, as part of the Griffiss International Airport Triangle Development. The project includes pavement reconstruction, storm drainage, detour lighting, precast walls, street lighting, utilities, parking, sidewalks, trail, signage, pavement markings, and landscaping.
Posted Date
-
Due Date
Dec 12, 2025
Oneida County
Close: Dec 12, 2025
Oneida County is soliciting bids to construct a 2‑lane roundabout at the intersection of NYS Route 825 and Perimeter Road in Rome, NY, as part of the Griffiss International Airport Triangle Development. The project includes pavement reconstruction, storm drainage, detour lighting, precast walls, street lighting, utilities, parking, sidewalks, trail, signage, pavement markings, and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis