Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: Install solar photovoltaic parking canopies to generate an estimated 616,213 kilowatt-hours annually and help combat the urban heat island effect. The proposed site for the photovoltaic parking canopies is at the two waters administrative complex, north parking lot directly to the east of the justice facility building (justic center). The existing parking lot consists of 392 parking stalls (approximately 4.8± acres) the intent is to provide shade canopies and associated photovoltaic panels for a portion of the existing parking stalls. Final extent of the shade canopies and photovoltaic systems will be dependent on the existing site conditions and available grant funding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Genesee County is seeking proposals from qualified Design-Build firms for the design, engineering, and construction of a photovoltaic solar canopy project
Posted Date
Jan 9, 2026
Due Date
Feb 18, 2026
Release: Jan 9, 2026
Close: Feb 18, 2026
Genesee County is seeking proposals from qualified Design-Build firms for the design, engineering, and construction of a photovoltaic solar canopy project
AvailableThe Salt River Pima-Maricopa Indian Community (SRPMIC) issued RFP PW-26-013 for Design-Build Construction Services to install solar photovoltaic parking canopies and associated infrastructure at the Two Waters Administrative Complex in Scottsdale, AZ. Scope includes canopies with PV systems, canopy lighting, landscape/irrigation modifications, parking lot repair/re-striping, and new electrical service connections to produce an estimated 616,213 kWh annually across ~4.8 acres and 392 parking stalls. A mandatory pre-proposal meeting is scheduled for January 6, 2026 (2:00 PM) and proposals are due January 22, 2026 (5:00 PM); the procurement is subject to federal EPA grant requirements (Buy America/BABA, Davis-Bacon) and Community procurement preferences.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
The Salt River Pima-Maricopa Indian Community (SRPMIC) issued RFP PW-26-013 for Design-Build Construction Services to install solar photovoltaic parking canopies and associated infrastructure at the Two Waters Administrative Complex in Scottsdale, AZ. Scope includes canopies with PV systems, canopy lighting, landscape/irrigation modifications, parking lot repair/re-striping, and new electrical service connections to produce an estimated 616,213 kWh annually across ~4.8 acres and 392 parking stalls. A mandatory pre-proposal meeting is scheduled for January 6, 2026 (2:00 PM) and proposals are due January 22, 2026 (5:00 PM); the procurement is subject to federal EPA grant requirements (Buy America/BABA, Davis-Bacon) and Community procurement preferences.
Solar canopy for employee parking lot.
Posted Date
Oct 24, 2025
Due Date
Jan 29, 2026
Release: Oct 24, 2025
Close: Jan 29, 2026
Solar canopy for employee parking lot.
AvailableThe City of Gainesville Regional Transit System (RTS) requests proposals to design and construct a photovoltaic (PV) solar canopy covering the employee parking lot to provide renewable power to RTS facilities; the project budget is approximately $4.3M and includes installation across hundreds of parking spaces. The procurement requires compliance with Federal Transit Administration (FTA) clauses, Buy America, Davis-Bacon wage requirements, DBE and other certifications, and includes multiple attachments and addenda; proposals are due January 29, 2026 at 3:00pm ET.
Posted Date
Oct 20, 2025
Due Date
Jan 29, 2026
Release: Oct 20, 2025
Close: Jan 29, 2026
The City of Gainesville Regional Transit System (RTS) requests proposals to design and construct a photovoltaic (PV) solar canopy covering the employee parking lot to provide renewable power to RTS facilities; the project budget is approximately $4.3M and includes installation across hundreds of parking spaces. The procurement requires compliance with Federal Transit Administration (FTA) clauses, Buy America, Davis-Bacon wage requirements, DBE and other certifications, and includes multiple attachments and addenda; proposals are due January 29, 2026 at 3:00pm ET.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis