Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Genesee County is seeking proposals from qualified Design-Build firms for the design, engineering, and construction of a photovoltaic solar canopy project
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Posted Date
Dec 5, 2025
Due Date
Jan 12, 2026
Release: Dec 5, 2025
Close: Jan 12, 2026
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD install solar pv systems.
Posted Date
Nov 24, 2025
Due Date
Jan 29, 2026
Release: Nov 24, 2025
Close: Jan 29, 2026
DESIGN-BUILD install solar pv systems.
AvailableDESIGN-BUILD: Install solar photovoltaic parking canopies to generate an estimated 616,213 kilowatt-hours annually and help combat the urban heat island effect. The proposed site for the photovoltaic parking canopies is at the two waters administrative complex, north parking lot directly to the east of the justice facility building (justic center). The existing parking lot consists of 392 parking stalls (approximately 4.8± acres) the intent is to provide shade canopies and associated photovoltaic panels for a portion of the existing parking stalls. Final extent of the shade canopies and photovoltaic systems will be dependent on the existing site conditions and available grant funding.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
DESIGN-BUILD: Install solar photovoltaic parking canopies to generate an estimated 616,213 kilowatt-hours annually and help combat the urban heat island effect. The proposed site for the photovoltaic parking canopies is at the two waters administrative complex, north parking lot directly to the east of the justice facility building (justic center). The existing parking lot consists of 392 parking stalls (approximately 4.8± acres) the intent is to provide shade canopies and associated photovoltaic panels for a portion of the existing parking stalls. Final extent of the shade canopies and photovoltaic systems will be dependent on the existing site conditions and available grant funding.
AvailableDesign-Build: Provide turnkey design and construction of a new hurricane-rated open-air canopy covering the existing multipurpose rink. includes structural foundations, full-coverage roof system, LED sports lighting, HVLS fans, modular sports flooring, athletic equipment, sitework, and drainage improvements, add alternates include entry pavilion, bleacher pavilion, and sound system.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Close: Jan 16, 2026
Design-Build: Provide turnkey design and construction of a new hurricane-rated open-air canopy covering the existing multipurpose rink. includes structural foundations, full-coverage roof system, LED sports lighting, HVLS fans, modular sports flooring, athletic equipment, sitework, and drainage improvements, add alternates include entry pavilion, bleacher pavilion, and sound system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →