Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Torrance issued an RFP for a design-build contractor to design and construct a multi-level parking structure at the Torrance Regional Transit Center (465 Crenshaw Blvd) that is EV-ready, PV-ready, and includes Low-Impact Development stormwater features. The RFP is a procurement (not a grant), with electronic submissions required; the project is estimated at approximately $30M–$60M. The procurement contact listed is Ian Calhoun (City of Torrance Purchasing), and the bid is in active bidding stage with responses due Jan 30, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
To construct a temporary surface parking lot.
Posted Date
Dec 11, 2025
Due Date
Feb 13, 2026
Release: Dec 11, 2025
Close: Feb 13, 2026
To construct a temporary surface parking lot.
AvailableDESIGN-BUILD: Provide full design and construction services for a relocatable Connex-supported roof structure.
Posted Date
Dec 29, 2025
Due Date
Jan 19, 2026
Release: Dec 29, 2025
Close: Jan 19, 2026
DESIGN-BUILD: Provide full design and construction services for a relocatable Connex-supported roof structure.
AvailableDesign-build project to replace the parking lot at the workforce center.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
Design-build project to replace the parking lot at the workforce center.
AvailableDesign/build construction for child development.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Design/build construction for child development.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis