Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build project to replace the parking lot at the workforce center.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the replacement of the parking lot at the Florence Workforce Center.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
This RFP is for the replacement of the parking lot at the Florence Workforce Center.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Vendor to mill and remove approximately 4-6" of existing asphalt/concrete from visitor parking lot (parking lot on west side of Main Building). Vendor to remove grass and concrete curb around existing fire hydrant. Vendor to install bollards around existing fire hydrant compliant with appropriate codes. Vendor to repave parking lot using bituminous asphalt utilizing existing curb, gutter, manholes, etc. The contract will have an initial term commencing upon the last dated signature of the Parties and ending on 06/30/2026.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
Vendor to mill and remove approximately 4-6" of existing asphalt/concrete from visitor parking lot (parking lot on west side of Main Building). Vendor to remove grass and concrete curb around existing fire hydrant. Vendor to install bollards around existing fire hydrant compliant with appropriate codes. Vendor to repave parking lot using bituminous asphalt utilizing existing curb, gutter, manholes, etc. The contract will have an initial term commencing upon the last dated signature of the Parties and ending on 06/30/2026.
AvailableThis RFP is for Design Services for parking lot improvements to the Strawberry Lot, with an optional bid for the Peach Lot.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
This RFP is for Design Services for parking lot improvements to the Strawberry Lot, with an optional bid for the Peach Lot.
AvailableRepave parking lot g. Work includes, but is not limited to all labor, material, equipment and supervision to perform general construction, alternations, roads, walks, grading, drainage, necessary removal of existing structures and constructions and certain other items. Work includes demolition of the existing site and installation of a new parking lot on the Montrose VA Medical Center campus. Electrical Work: Electrical work on this project includes all labor, material, equipment and supervision to perform the required electrical construction work on this project, including the installation of pole mounted lighting fixtures and all associated materials, etc. as required for complete and functional installation. See attached file.
Posted Date
Nov 21, 2025
Due Date
Jan 14, 2026
Release: Nov 21, 2025
Close: Jan 14, 2026
Repave parking lot g. Work includes, but is not limited to all labor, material, equipment and supervision to perform general construction, alternations, roads, walks, grading, drainage, necessary removal of existing structures and constructions and certain other items. Work includes demolition of the existing site and installation of a new parking lot on the Montrose VA Medical Center campus. Electrical Work: Electrical work on this project includes all labor, material, equipment and supervision to perform the required electrical construction work on this project, including the installation of pole mounted lighting fixtures and all associated materials, etc. as required for complete and functional installation. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →