Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: Provide full design and construction services for a relocatable Connex-supported roof structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD work includes removal of the existing flat roof system at the wastewater treatment plant office facility and replace it with a new pitched truss roof structure with a metal roofing system.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
DESIGN-BUILD work includes removal of the existing flat roof system at the wastewater treatment plant office facility and replace it with a new pitched truss roof structure with a metal roofing system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN BUILD- remove and replace the existing roof on areas 2-6, total roof area is approx., 334,725 SF.
Posted Date
Jan 2, 2026
Due Date
Feb 3, 2026
Release: Jan 2, 2026
Close: Feb 3, 2026
DESIGN BUILD- remove and replace the existing roof on areas 2-6, total roof area is approx., 334,725 SF.
AvailableDESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
Posted Date
Dec 30, 2025
Due Date
Feb 25, 2026
Release: Dec 30, 2025
Close: Feb 25, 2026
DESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
AvailableDESIGN-BUILD Perform progressive design build services for the center for excellence building.
Posted Date
Dec 22, 2025
Due Date
Feb 10, 2026
Release: Dec 22, 2025
Close: Feb 10, 2026
DESIGN-BUILD Perform progressive design build services for the center for excellence building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →