Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
FDCC (00047)
DESIGN-BUILD/Project involves a full design-build recapitalization of waterfront structures. The base scope includes replacing small boat timber piers, floating docks, gangways, and associated utility lines, along with all required design, permitting, materials, labor, and construction services. An optional scope adds the design and construction of a new bulkhead system, including demolition and replacement of approximately 380 feet of existing waterfront bulkhead using sheet piles and a concrete cap, with all supporting services such as mobilization, quality control, and permitting.
Posted Date
-
Due Date
Jun 1, 2026
FDCC (00047)
Close: Jun 1, 2026
DESIGN-BUILD/Project involves a full design-build recapitalization of waterfront structures. The base scope includes replacing small boat timber piers, floating docks, gangways, and associated utility lines, along with all required design, permitting, materials, labor, and construction services. An optional scope adds the design and construction of a new bulkhead system, including demolition and replacement of approximately 380 feet of existing waterfront bulkhead using sheet piles and a concrete cap, with all supporting services such as mobilization, quality control, and permitting.
FDCC (00047)
MSI TOPCon Bifacial 144HC dual glass solar panels. Panels must be 580-590W, have up to 5400 Pa front load, 2400 Pa back load, and test load to UL 61730 & IEC standards
Posted Date
Apr 15, 2026
Due Date
Apr 22, 2026
Release: Apr 15, 2026
FDCC (00047)
Close: Apr 22, 2026
MSI TOPCon Bifacial 144HC dual glass solar panels. Panels must be 580-590W, have up to 5400 Pa front load, 2400 Pa back load, and test load to UL 61730 & IEC standards
FDCC (00047)
Provide new construction, renovation, and repairs of commercial and institutional facilities.
Posted Date
Jan 2, 2026
Due Date
Jan 19, 2026
Release: Jan 2, 2026
FDCC (00047)
Close: Jan 19, 2026
Provide new construction, renovation, and repairs of commercial and institutional facilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
FDCC (00047)
ACCESS/SECURITY/VIDEO MAINTENANCE
Effective Date
Aug 19, 2024
Expires
Effective: Aug 19, 2024
FDCC (00047)
Expires:
ACCESS/SECURITY/VIDEO MAINTENANCE
FDCC (00047)
DESIGN BUILD TRAINING
Effective Date
Aug 11, 2025
Expires
Effective: Aug 11, 2025
FDCC (00047)
Expires:
DESIGN BUILD TRAINING
FDCC (00047)
COPIER LEASE AGREEMENT FOR SEATTLE FDCC OFFICE COPIER 01 SEPT 2022 - 31 AUG 2023
Effective Date
Aug 25, 2022
Expires
Effective: Aug 25, 2022
FDCC (00047)
Expires:
COPIER LEASE AGREEMENT FOR SEATTLE FDCC OFFICE COPIER 01 SEPT 2022 - 31 AUG 2023
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Commanding Officer, USCG, Facilities Design & Construction Center
Premium
Access the largest public sector contact database
© 2026 Starbridge