CountyCA
Posted
Jun 29, 2026
Dec 3, 2026
SCVMC Building M Operation Rooms (OR) Renovation (Request for Qualification)
The purpose of this project is to reconfigure and upgrade approx 21,000 sf of the existing second floor of building m. This project consists of 4 phases including new structural heart room, new catheterization lab, replacing end-of-life equipment currently in use in structural heart room and creating a fully functional catheterization lab along with a full reorganization of the post anesthesia care unit (PACU). New hybrid operating room, with associated equipment installation and support spaces.
