McAlester School District I-80
School DistrictOK
Posted
Nov 5, 2026
Dec 3, 2026
Training Facility Locker Room Addition Bid Package #1
Work includes demolition, concrete, masonry, misc. steel, architectural millwork, joint sealants and waterproofing, door assemblies supply, door assemblies install, aluminum storefronts and glazing, gypsum assemblies, flooring and wall tile, painting, resinous flooring, specialties, signage, pre-engineer metal building, fire suppression, plumbing, hvac, electrical, fire alarm, earthwork, site utilities and storm sewer system.
