Training Facility Locker Room Addition Bid Package #1
Posted
Nov 5, 2026
Dec 3, 2026
Work includes demolition, concrete, masonry, misc. steel, architectural millwork, joint sealants and waterproofing, door assemblies supply, door assemblies install, aluminum storefronts and glazing, gypsum assemblies, flooring and wall tile, painting, resinous flooring, specialties, signage, pre-engineer metal building, fire suppression, plumbing, hvac, electrical, fire alarm, earthwork, site utilities and storm sewer system.



