CountyOK
Posted
Aug 27, 2026
Sep 21, 2026
Demolish DHS Building RFP
Demolish Building.
Description: Demolish modular building 8" its entirety. Building 8 is an approx. 3,840 SF building built in 1978 and consists of (4) single-wide trailers joined together. The building was previously used as administrative office space and later storage for seeds in bags. It also contains restroom facilities. All interior components-including but not limited to walls, ceilings, flooring, mechanical/electrical/plumbing (MEP) fixtures, casework, restroom fixtures, and any remaining contents-shall be fully demolished, removed from the location, and disposed of in a proper, legal manner.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Rural Housing Service.
Adjacent opportunities open for bidding right now.
CountyOK
Posted
Aug 27, 2026
Sep 21, 2026
Demolish Building.
Illinois Capital Development Board
State AgencyIL
Posted
-
Oct 20, 2026
The Illinois Capital Development Board is seeking construction bids for Demolish Pedestrian Bridge and Hilltop Restaurant at Lincoln's New Salem Historic Site in Petersburg, Menard County, Illinois. The work is a demolition project and is a construction procurement rather than a grant program. The opportunity is listed as a pre-bid notification with responses due October 20, 2026, and the official procurement page directs bidders to CDB's sealed-bid process.
Illinois Capital Development Board
State AgencyIL
Posted
Aug 25, 2026
Oct 6, 2026
Traffic Equipment Building Existing (D0906), New (IDOT 572-0002): Demolish the existing structure down to the existing slab to remain. Construct approximately 4,635 square foot, single-story post framed building over the existing concrete slab. The new posts will be set in a new grade beam around the perimeter of the existing slab. Install metal wall panels and concealed fastener roof system. Install insulation in the exterior walls and install wall panel up to the bottom of the trusses. Install insulation in the attic. Install new overhead doors and man doors. Reinstall the existing air compressor and gas fired heating system. Install new lighting, wiring, receptacles, and panel. Modify sanitary piping and install oil separator. Site work includes replacement of asphalt apron with concrete.
Montachusett Regional Vocational Technical School District
School DistrictMA
Posted
Aug 21, 2026
Sep 17, 2026
Modular building adjacent to the existing building. The modular building will be approximately 1,500 - 2,200 SF.