Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrades to water tower pumping controls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Upgrade controls for four (4) Delta Control Panels. Upgrade the associated twenty-five (25) VAV’s to work with the upgraded panels. All work includes the labor and material for a complete and fully functional system that allows monitoring and control through the existing Delta Controls enteliWEB Graphical Interface.
Posted Date
Nov 25, 2025
Due Date
Dec 12, 2025
Release: Nov 25, 2025
Close: Dec 12, 2025
Upgrade controls for four (4) Delta Control Panels. Upgrade the associated twenty-five (25) VAV’s to work with the upgraded panels. All work includes the labor and material for a complete and fully functional system that allows monitoring and control through the existing Delta Controls enteliWEB Graphical Interface.
Premium
Access the largest public sector contact database
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Posted Date
Jul 16, 2025
Due Date
Dec 12, 2025
Release: Jul 16, 2025
Close: Dec 12, 2025
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailableThis project includes the construction of a new 1.5 million gallon composite elevated water tower. This project also includes the water main, valves and other appurtenances, controls, tank control valve, electrical connections, water fill station, drainage, pavement, and site fencing as specified. Supplemental to this New Paradise tower, a tank control valve will need to be installed offsite to control flows for the existing Plank tower. Lastly, this project will include the demolition and removal of the existing Paradise water tower adjacent to the new tower site as well as the demolition and removal of the offsite Frame standpipe. The demolition will include the disconnection of any and all utility services as necessary.
Posted Date
Nov 11, 2025
Due Date
Dec 15, 2025
Release: Nov 11, 2025
Close: Dec 15, 2025
This project includes the construction of a new 1.5 million gallon composite elevated water tower. This project also includes the water main, valves and other appurtenances, controls, tank control valve, electrical connections, water fill station, drainage, pavement, and site fencing as specified. Supplemental to this New Paradise tower, a tank control valve will need to be installed offsite to control flows for the existing Plank tower. Lastly, this project will include the demolition and removal of the existing Paradise water tower adjacent to the new tower site as well as the demolition and removal of the offsite Frame standpipe. The demolition will include the disconnection of any and all utility services as necessary.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis