Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the construction of a new 1.5 million gallon composite elevated water tower. This project also includes the water main, valves and other appurtenances, controls, tank control valve, electrical connections, water fill station, drainage, pavement, and site fencing as specified. Supplemental to this New Paradise tower, a tank control valve will need to be installed offsite to control flows for the existing Plank tower. Lastly, this project will include the demolition and removal of the existing Paradise water tower adjacent to the new tower site as well as the demolition and removal of the offsite Frame standpipe. The demolition will include the disconnection of any and all utility services as necessary.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work to be performed under this Contract includes demolition and disposal of the existing 2-million-gallon abovegrade welded steel water storage tank, followed by construction of a new AWWA D110, Type III wire-wound, prestressed concrete water storage tank. The new tank will have an inside diameter of 119' and a high-water depth of 36', providing a total capacity of 3 million gallons. Construction of the new tank will include demolition of existing infrastructure, modifications to existing utilities, installation of new water lines and valves, and all associated earthwork.
Posted Date
Dec 8, 2025
Due Date
Jan 16, 2026
Release: Dec 8, 2025
Close: Jan 16, 2026
Work to be performed under this Contract includes demolition and disposal of the existing 2-million-gallon abovegrade welded steel water storage tank, followed by construction of a new AWWA D110, Type III wire-wound, prestressed concrete water storage tank. The new tank will have an inside diameter of 119' and a high-water depth of 36', providing a total capacity of 3 million gallons. Construction of the new tank will include demolition of existing infrastructure, modifications to existing utilities, installation of new water lines and valves, and all associated earthwork.
AvailableProject involves construction of a new two-million- gallon prestressed concrete ground storage tank and water booster pump station. All site work, site piping, tank construction, booster pump station construction, and electrical work are included in this project.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
Project involves construction of a new two-million- gallon prestressed concrete ground storage tank and water booster pump station. All site work, site piping, tank construction, booster pump station construction, and electrical work are included in this project.
AvailablePurchase and on-site delivery of 5-gallon purified water bottles, and the rental of water dispensers
Posted Date
Nov 26, 2025
Due Date
Dec 22, 2025
Release: Nov 26, 2025
Close: Dec 22, 2025
Purchase and on-site delivery of 5-gallon purified water bottles, and the rental of water dispensers
AvailableRequest for qualifications to provide professional engineering services for design, permitting, bidding, and construction-phase services (including CE&I and as-built drawings) for a new 2.0 million gallon elevated drinking water tank and approximately 725 ft of 24" water main, including survey, geotechnical, structural, civil, electrical, environmental permitting, easements, cost estimating, and construction inspection.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Request for qualifications to provide professional engineering services for design, permitting, bidding, and construction-phase services (including CE&I and as-built drawings) for a new 2.0 million gallon elevated drinking water tank and approximately 725 ft of 24" water main, including survey, geotechnical, structural, civil, electrical, environmental permitting, easements, cost estimating, and construction inspection.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis