Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Elizabeth City is soliciting bids to replace a 3.0-million-gallon raw water reservoir tank at its water treatment plant, including all work to complete, test, and accept the new tank. The solicitation requires bid security of 5% of the bid and sets a goal for 10% of the contract amount to be awarded to certified MWBEs; a non-mandatory pre-bid conference is scheduled. Bidding opened 2025-12-19 and closes 2026-02-05.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Variable Frequency Drive (VFD) Replacement for Raw Water Pumps At Water Treatment Plant #2.
Posted Date
Dec 14, 2025
Due Date
Jan 15, 2026
Release: Dec 14, 2025
Close: Jan 15, 2026
Variable Frequency Drive (VFD) Replacement for Raw Water Pumps At Water Treatment Plant #2.
AvailableWater Treatment Plant Raw Water and Clarification Improvements CMAR.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
Water Treatment Plant Raw Water and Clarification Improvements CMAR.
AvailableWork to be performed under this Contract includes demolition and disposal of the existing 2-million-gallon abovegrade welded steel water storage tank, followed by construction of a new AWWA D110, Type III wire-wound, prestressed concrete water storage tank. The new tank will have an inside diameter of 119' and a high-water depth of 36', providing a total capacity of 3 million gallons. Construction of the new tank will include demolition of existing infrastructure, modifications to existing utilities, installation of new water lines and valves, and all associated earthwork.
Posted Date
Dec 8, 2025
Due Date
Jan 16, 2026
Release: Dec 8, 2025
Close: Jan 16, 2026
Work to be performed under this Contract includes demolition and disposal of the existing 2-million-gallon abovegrade welded steel water storage tank, followed by construction of a new AWWA D110, Type III wire-wound, prestressed concrete water storage tank. The new tank will have an inside diameter of 119' and a high-water depth of 36', providing a total capacity of 3 million gallons. Construction of the new tank will include demolition of existing infrastructure, modifications to existing utilities, installation of new water lines and valves, and all associated earthwork.
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis