CityTX
Posted
Sep 3, 2026
Sep 23, 2026
Annual As Needed Curb and Gutter and Asphalt and Concrete Repairs
Work includes approx 10,000 LF 6" thick 30" wide remove and replace curb and gutter; 12,000 SY 2" mill and site preparation for asphalt overlay; 10 EA ADA ramps; 500 SY block sod to match existing turf.