Closed

Crystal River Airport (CGC) Fuel Farm Project (ITB)

Description: Removal, replacement, and installation of two fuel tanks. This includes removal and replacement of two 12,000 gallon aviation fuel tanks, two sump recovery tanks, pumps, filters, piping (relocating existing and new), hoses, reels, coatings, painting, concrete sealing and repairs, electrical lighting power, Emergency Fuel Shut-Off (EFSO), Scully system, galvanized steel catwalk, electrical generator system included transfer switch and enlarged platform, utility rack with lighting controls and panels, remote fueling cabinet, card reader, asphalt patching, and other work incidental to the completion of this project.

Buyer
Citrus County

County · FL, US

Released
Jan 4, 2025
Closes
Feb 6, 2025(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts