Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Tampa Bay Water (ITB Ref. #2026017) requests sealed bids to construct ~500 LF of 60-inch welded steel transmission main beneath State Road 52 using open-cut and micro-tunneling methods, including pipe fabrication, welding, testing, cathodic protection, and restoration. The solicitation is an Invitation to Bid (ITB), not a grant, with mandatory insurance and a 5% bid bond requirement and includes required permits and technical specifications in the ITB attachments. The project timeline includes a pre-bid/site visit on Feb 18, 2026, a questions deadline of Feb 27, 2026, and bid closing on Mar 17, 2026 (buyer portal close date/time is authoritative).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes approx 13,240 LF of 16" C900 DR14 PVC waterline; 1 LS 6" connection to existing waterline; 5 EA 16" inline butterfly valves; 1 LS olive booster pump station.
Posted Date
Jan 5, 2026
Due Date
Feb 10, 2026
Release: Jan 5, 2026
Close: Feb 10, 2026
Work includes approx 13,240 LF of 16" C900 DR14 PVC waterline; 1 LS 6" connection to existing waterline; 5 EA 16" inline butterfly valves; 1 LS olive booster pump station.
AvailableConstruction management and/or engineering firms for construction management services to manage all remaining phases of the large diameter transmission main project.
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Close: Feb 6, 2026
Construction management and/or engineering firms for construction management services to manage all remaining phases of the large diameter transmission main project.
AvailableProvide professional engineering services to design a new water storage tank & transmission main (tower #5).
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Provide professional engineering services to design a new water storage tank & transmission main (tower #5).
AvailableWork interludes transmission main & pump station improvements
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Work interludes transmission main & pump station improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis