Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 2,800 LF of 8" HDPE or PVC force main by open cut and directional bore; 4,000 LF of 18" PVC gravity sewer; 3,600 LF of 24" gravity sewer; a duplex lift station in 10' wet well, valve vault, meter vault, manholes, air release valves associated site restoration, electrical and instrumentation and controls, and all related work. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 2026 sanitary bypass pump & sanitary lift station inspection and bypass pump wet testing.
Posted Date
Jan 9, 2026
Due Date
Jan 23, 2026
Release: Jan 9, 2026
Close: Jan 23, 2026
Work includes 2026 sanitary bypass pump & sanitary lift station inspection and bypass pump wet testing.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
For the replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Posted Date
Jan 11, 2026
Due Date
Feb 5, 2026
Release: Jan 11, 2026
Close: Feb 5, 2026
For the replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
AvailableProject will include installation of a new wastewater lift station including wet well, package wet-well, control building, site electrical, backup generator, site grading and other site improvements including access road, concrete pavement and fencing. Sanitary sewer force main installation totals approx., 6,500 LF of 6" HDPE.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Project will include installation of a new wastewater lift station including wet well, package wet-well, control building, site electrical, backup generator, site grading and other site improvements including access road, concrete pavement and fencing. Sanitary sewer force main installation totals approx., 6,500 LF of 6" HDPE.
AvailableThe Town of Grand Chute is seeking proposals for design and construction services for the full replacement of the Village in the Meadows sanitary sewer collection system lift station.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
The Town of Grand Chute is seeking proposals for design and construction services for the full replacement of the Village in the Meadows sanitary sewer collection system lift station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →