Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
For the replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Grand Chute is seeking proposals for design and construction services for the full replacement of the Village in the Meadows sanitary sewer collection system lift station.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
The Town of Grand Chute is seeking proposals for design and construction services for the full replacement of the Village in the Meadows sanitary sewer collection system lift station.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacing the existing sanitary sewer lift station, site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control.
Posted Date
Jan 9, 2026
Due Date
Feb 25, 2026
Release: Jan 9, 2026
Close: Feb 25, 2026
Work includes replacing the existing sanitary sewer lift station, site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping, paving, grading, seeding, and erosion control.
AvailableProject will include installation of a new wastewater lift station including wet well, package wet-well, control building, site electrical, backup generator, site grading and other site improvements including access road, concrete pavement and fencing. Sanitary sewer force main installation totals approx., 6,500 LF of 6" HDPE.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Project will include installation of a new wastewater lift station including wet well, package wet-well, control building, site electrical, backup generator, site grading and other site improvements including access road, concrete pavement and fencing. Sanitary sewer force main installation totals approx., 6,500 LF of 6" HDPE.
AvailableWork includes construction of a new sanitary sewer lift station and associated lift station appurtenances. Construction of an 8" gravity sewer line from existing lift station to new lift station. Construction of a 4" force main from existing lift station to new lift station. Demolition of the existing lift station and associated lift station appurtenances. Also includes 1 LS of barricades, signs and traffic handling; 1 LS of demolish existing lift station and appurtenances; 288 LF of 8" SDR 26 PVC gravity sewer line; see attached files.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Work includes construction of a new sanitary sewer lift station and associated lift station appurtenances. Construction of an 8" gravity sewer line from existing lift station to new lift station. Construction of a 4" force main from existing lift station to new lift station. Demolition of the existing lift station and associated lift station appurtenances. Also includes 1 LS of barricades, signs and traffic handling; 1 LS of demolish existing lift station and appurtenances; 288 LF of 8" SDR 26 PVC gravity sewer line; see attached files.