Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2026 sanitary bypass pump & sanitary lift station inspection and bypass pump wet testing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
3 ea trailer mounted diesel bypass pumps; 3 ea one sound attenuation pump enclosure.
Posted Date
Nov 22, 2025
Due Date
Jan 16, 2026
Release: Nov 22, 2025
Close: Jan 16, 2026
3 ea trailer mounted diesel bypass pumps; 3 ea one sound attenuation pump enclosure.
Purchase & Delivery of Sewer Bypass Pump and Appurtenances.
Posted Date
Jan 15, 2026
Due Date
Feb 3, 2026
Release: Jan 15, 2026
Close: Feb 3, 2026
Purchase & Delivery of Sewer Bypass Pump and Appurtenances.
AvailableInstallation of new wet well, three (3) new manholes, approximately 70 LF of 18" gravity sewer, approx 60 LF of 24" gravity sewer, new VFD’s and a new magnetic meter. Additionally, the project includes re-piping the existing valve vault, reconnection to the existing force main, replacement of pumps, bypass pumping and all other work
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Release: Dec 23, 2025
Close: Feb 3, 2026
Installation of new wet well, three (3) new manholes, approximately 70 LF of 18" gravity sewer, approx 60 LF of 24" gravity sewer, new VFD’s and a new magnetic meter. Additionally, the project includes re-piping the existing valve vault, reconnection to the existing force main, replacement of pumps, bypass pumping and all other work
AvailableWork includes 1 LS gorman-rupp asvp pump station with duplex submersible pumps; 26 VF polyurea lining wet well; 1 LS wet well (8' dia x 23' depth); 11 VF 48" diameter manhole; 14 VF 60" diameter manhole; 10 LF 12" type c sanitary sewer conduit; 50 LF 10" forcemain; 1 LS asphalt drive - remove and replace; 1 LS electrical work; 1 ls temporary sediment & erosion control; 1 LS temporary bypass pumping.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Work includes 1 LS gorman-rupp asvp pump station with duplex submersible pumps; 26 VF polyurea lining wet well; 1 LS wet well (8' dia x 23' depth); 11 VF 48" diameter manhole; 14 VF 60" diameter manhole; 10 LF 12" type c sanitary sewer conduit; 50 LF 10" forcemain; 1 LS asphalt drive - remove and replace; 1 LS electrical work; 1 ls temporary sediment & erosion control; 1 LS temporary bypass pumping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis