Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply of a dry blended poly / ortho corrosion control chemical to all three (3) city water treatment plants.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking a Consultant to perform a corrosion control desktop evaluation and offer technical recommendations to comply with optimized corrosion control treatment (OCCT) requirements of the Lead and Copper Rule Improvements (LCRI), including designation of optimal corrosion control treatment for each of the Authority’s treatment facilities. The ultimate goal of OCCT is to minimize the potential for corrosion of lead and copper in household premise plumbing within the Authority’s distribution system.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a Consultant to perform a corrosion control desktop evaluation and offer technical recommendations to comply with optimized corrosion control treatment (OCCT) requirements of the Lead and Copper Rule Improvements (LCRI), including designation of optimal corrosion control treatment for each of the Authority’s treatment facilities. The ultimate goal of OCCT is to minimize the potential for corrosion of lead and copper in household premise plumbing within the Authority’s distribution system.
Provide corrosion control & cathodic protection solutions. Work includes magnesium anodes (bare and packaged), cathodic protection and tracer wires, pipe wrap systems and primers, patch pads and exothermic weld protection, CP rectifiers and cabinets, flange insulation kits of various sizes, and associated cathodic protection services.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
Provide corrosion control & cathodic protection solutions. Work includes magnesium anodes (bare and packaged), cathodic protection and tracer wires, pipe wrap systems and primers, patch pads and exothermic weld protection, CP rectifiers and cabinets, flange insulation kits of various sizes, and associated cathodic protection services.
AvailableUpgrading existing cathodic protection systems by installing new anodes, new test stations and replacing any existing cathodic protection equipment. Removal of existing equipment to be replaced shall be performed for test stations and terminal boards. Removal or abandonment of existing depleted anodes shall be at the discretion of the Contractor except in the case of the elevator casing anodes which are to be removed prior to replacement.
Posted Date
Jan 22, 2026
Due Date
Mar 4, 2026
Release: Jan 22, 2026
Close: Mar 4, 2026
Upgrading existing cathodic protection systems by installing new anodes, new test stations and replacing any existing cathodic protection equipment. Removal of existing equipment to be replaced shall be performed for test stations and terminal boards. Removal or abandonment of existing depleted anodes shall be at the discretion of the Contractor except in the case of the elevator casing anodes which are to be removed prior to replacement.
AvailableProvide chemical analysis testing services. The firm must provide evaluations and maintenance on odor control units.
Posted Date
Jan 19, 2026
Due Date
Feb 19, 2026
Release: Jan 19, 2026
Close: Feb 19, 2026
Provide chemical analysis testing services. The firm must provide evaluations and maintenance on odor control units.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →