Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a contractor prequalification for construction services involving the interior and exterior coating of the 0.5 MG Eastwood North Tank, exterior coating of the 0.33 MG Eastwood South Tank, replacement of the north tank's anode, and installation of a new ladder safety device on the north tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work generally consists to rehabilitate the interior (wet) coating system includes removing the entire existing interior (wet) coating system with sandblasting; applying a new interior (wet) two (2) coating system consisting of one (1) coat zinc primer and one (1) coat epoxy; rehabilitation or replacement of steel in areas of corrosion; replacement of the existing drain valve in the bottom of the tank bowl, removal of the interior ladder in its entirety; install (weld anchors for future impressed cathodic protection),
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
Close: Feb 17, 2026
Work generally consists to rehabilitate the interior (wet) coating system includes removing the entire existing interior (wet) coating system with sandblasting; applying a new interior (wet) two (2) coating system consisting of one (1) coat zinc primer and one (1) coat epoxy; rehabilitation or replacement of steel in areas of corrosion; replacement of the existing drain valve in the bottom of the tank bowl, removal of the interior ladder in its entirety; install (weld anchors for future impressed cathodic protection),
AvailableQualified contractors to submit bids for Construction Services and Contractor Federal Prequalification for the Blight Elimination Round Four projects. This project involves the comprehensive rehabilitation of two quadplex residential structure.
Posted Date
Nov 18, 2025
Due Date
Jan 23, 2026
Release: Nov 18, 2025
Close: Jan 23, 2026
Qualified contractors to submit bids for Construction Services and Contractor Federal Prequalification for the Blight Elimination Round Four projects. This project involves the comprehensive rehabilitation of two quadplex residential structure.
Lincoln Unified School District requires prequalification for contractors and mechanical, electrical, and plumbing (MEP) subcontractors for future construction projects.
Posted Date
-
Due Date
Jan 30, 2026
Release: -
Close: Jan 30, 2026
Lincoln Unified School District requires prequalification for contractors and mechanical, electrical, and plumbing (MEP) subcontractors for future construction projects.
AvailablePrequalification for general contractors and mechanical, electrical, and plumbing subcontractors for future district projects.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Prequalification for general contractors and mechanical, electrical, and plumbing subcontractors for future district projects.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis