Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Detroit Land Bank Authority
Selective demolition is a critical phase in the rehabbed & ready pre-construction workflow, occurring after asbestos abatement has been completed and cleared by an environmental consultant. At this stage, all hazardous materials have been properly removed, and the structure is deemed safe for targeted demolition work. Selective demolition is performed to remove damaged, outdated, or non-compliant building materials while preserving key structural and architectural components.
Posted Date
Jan 27, 2026
Due Date
Feb 10, 2026
Release: Jan 27, 2026
Detroit Land Bank Authority
Close: Feb 10, 2026
Selective demolition is a critical phase in the rehabbed & ready pre-construction workflow, occurring after asbestos abatement has been completed and cleared by an environmental consultant. At this stage, all hazardous materials have been properly removed, and the structure is deemed safe for targeted demolition work. Selective demolition is performed to remove damaged, outdated, or non-compliant building materials while preserving key structural and architectural components.
Detroit Land Bank Authority
Provide professional carpet cleaning services for all carpeted areas on floors 11, 12, and 15. Areas include, but are not limited to: hallways, lobbies, cubicles, offices. conference rooms. Square footage per floor: 11th floor: 13,848 SF, 12th floor: 13,980 SF, 15th floor: 12,210 SF.
Posted Date
Dec 5, 2025
Due Date
Dec 18, 2025
Release: Dec 5, 2025
Detroit Land Bank Authority
Close: Dec 18, 2025
Provide professional carpet cleaning services for all carpeted areas on floors 11, 12, and 15. Areas include, but are not limited to: hallways, lobbies, cubicles, offices. conference rooms. Square footage per floor: 11th floor: 13,848 SF, 12th floor: 13,980 SF, 15th floor: 12,210 SF.
Detroit Land Bank Authority
To perform comprehensive general construction services for properties. Services may include, but are not limited to: selective demolition, structural repairs, rough and finish carpentry, mechanical, electrical, and plumbing (mep) improvements, roofing, window and door replacement, interior and exterior finish work, and full site restoration, including grading, seeding, concrete or asphalt repair, fencing, and other work necessary
Posted Date
Nov 20, 2025
Due Date
Dec 5, 2025
Release: Nov 20, 2025
Detroit Land Bank Authority
Close: Dec 5, 2025
To perform comprehensive general construction services for properties. Services may include, but are not limited to: selective demolition, structural repairs, rough and finish carpentry, mechanical, electrical, and plumbing (mep) improvements, roofing, window and door replacement, interior and exterior finish work, and full site restoration, including grading, seeding, concrete or asphalt repair, fencing, and other work necessary
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Detroit Land Bank Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database